Harness the Power of the Sun for a Brighter, Greener Tomorrow with Innovative Solutions

Alliant Energy adds 100-MW BESS next to 200-MW Wisconsin solar project

Share

The brand new BESS undertaking is co-located with the Grant County photo voltaic undertaking, pictured right here. Credit score: Alliant Power

Alliant Power introduced the profitable integration of its first 100-MW Battery Power Storage System (BESS). Positioned subsequent to the corporate’s 200-MW solar project in Grant County, the newly operational battery captures and shops extra vitality generated by photo voltaic and different assets, then releases the vitality to the grid as wanted.

“Power storage methods, like this one, complement our current era assets and function an extremely essential step towards making a extra clever and resilient grid,” mentioned David de Leon, president of Alliant Power’s Wisconsin vitality firm. “The mix of BESS and photo voltaic is a essential a part of our balanced vitality portfolio. Collectively, they provide monumental potential, including worth and adaptability, whereas making certain the provision of dependable and cost-effective vitality for our prospects.”

The brand new BESS undertaking.

This BESS system can energy over 100,000 houses for as much as 4 hours on a single cost.

Power storage infrastructure is a more moderen a part of Alliant Power’s strategy and a key a part of bolstering their investments in renewable vitality. Battery storage positions Alliant Power to satisfy demand, scale back the necessity for conventional energy grid updates and ensures preparedness for outages and extreme climate.

Information merchandise from Alliant Power

Trending Merchandise

0
Add to compare
.

We will be happy to hear your thoughts

Leave a reply

Run On The Sun
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart